Project | Refrigeration installations |
Duration | Approx. 6 months |
Material | S235 |
Number of welds | Approx. 500 welds |
Dimensions | DN60, DN80, DN120 |
High-quality rooftop installation – Zeiss
Steel pipelines have been installed on stable support structures. Valves and manifolds have been integrated to ensure reliable system operation and easy maintenance.