| Project | Refrigeration installations |
| Duration | Approx. 6 months |
| Material | S235 |
| Number of welds | Approx. 500 welds |
| Dimensions | DN60, DN80, DN120 |
High-quality rooftop installation – Zeiss
Steel pipelines have been installed on stable support structures. Valves and manifolds have been integrated to ensure reliable system operation and easy maintenance.