Projekt: Carl Zeiss Jena

Project Refrigeration installations
Duration Approx. 18 months
Material 1.4301, S235, 16Mo3
Number of welds Approx. 5000 welds
Dimensions DN60, DN80, DN120 – DN600

Technical floors – Installed with steel structures to ensure stability and safe maintenance.
Materials and execution – Steel pipes with thermal insulation and anti-corrosion protection have been used, with flanged connections for easy servicing.
Reliable system operation – Fans, chillers, pumps, and manifolds have been installed and connected into an energy-efficient and safe heating and cooling system.