Projectheating installation
DurationApprox. 7 months
MaterialS235, 16Mo3
Number of weldsApprox. 1200 welds
DimensionsDN60, DN80, DN120

Pumping station installation – Powerful KSB pumps have been installed and connected to large-diameter steel pipelines, ensuring reliable operation of the heating and cooling system.
Quality materials – Carbon steel pipes with flanged connections, valves, and filters have been used for safe and long-lasting operation.
Stable structure – All installations are fixed on galvanized steel supports and platforms for easy maintenance and system stability.
Detailed execution – Shut-off and control valves, automatic filters, and measuring instruments are installed for optimal flow and pressure control.