Projekt: Electrical Installation

The scope of installation includes: The wiring harnesses are routed through predefined cable ducts and junction boxes, with each connection subjected to continuity and insulation resistance testing. The electrical configuration supports both centralized control from the driver’s cab and decentralized subsystem diagnostics. The project is executed with precision in line with railway standards UIC, TSI, […]
Projekt: WiWeb Erding

Project heating installation Duration Approx. 7 months Material S235, 16Mo3 Number of welds Approx. 1200 welds Dimensions DN60, DN80, DN120 Pumping station installation – Powerful KSB pumps have been installed and connected to large-diameter steel pipelines, ensuring reliable operation of the heating and cooling system.Quality materials – Carbon steel pipes with flanged connections, valves, and […]
Projekt: Carl Zeiss Jena

Project Refrigeration installations Duration Approx. 18 months Material 1.4301, S235, 16Mo3 Number of welds Approx. 5000 welds Dimensions DN60, DN80, DN120 – DN600 Technical floors – Installed with steel structures to ensure stability and safe maintenance.Materials and execution – Steel pipes with thermal insulation and anti-corrosion protection have been used, with flanged connections for easy […]
Projekt: Carl Zeiss Berlin

Project Refrigeration installations Duration Approx. 6 months Material S235 Number of welds Approx. 500 welds Dimensions DN60, DN80, DN120 High-quality rooftop installation – Zeiss Steel pipelines have been installed on stable support structures. Valves and manifolds have been integrated to ensure reliable system operation and easy maintenance.
Projekt: Audi Formula Racing

Project AD Blue Supply and fuel pipelines Duration Approx. 5 months Material 1.4301 stainless steel Number of welds Approx. 600 welds Dimensions DN15 – DN50 Stainless steel installation A stainless steel installation has been completed on the project, featuring high-quality flanged connections and orbital welding. Electromotorized valves and fittings have been installed for reliable automation […]
Projekt: Universitätsklinikum Münster (UKM)

Project heating installation Duration Approx. 11 months Material 1.4301, S235, 16Mo3 Number of welds Approx. 4 000 welds Dimensions DN60 – DN500 The construction and modernization of UKM included the implementation of key mechanical systems: heating, cooling, drainage, and medical gases. Kilometers of pipelines were installed, made of stainless steel, copper, and pre-insulated steel, tailored […]
Projekt: Neubau Zentralklinikum Lörrach

Project heating installation Duration Approx. 3 Years Material 1.4301, S235, 16Mo3 Number of welds Approx. 3500 welds Dimensions DN60, DN80, DN120 The Zentralklinikum project in Lörrach involves the complex installation of all key systems for heating, ventilation, air conditioning, plumbing, and drainage. Pre-insulated steel pipes are used for the heating system, while stainless steel and […]