Projekt: Audi Formula Racing

ProjectAD Blue Supply and fuel pipelines
DurationApprox. 5 months
Material1.4301 stainless steel
Number of weldsApprox. 600 welds
DimensionsDN15 – DN50

Stainless steel installation

A stainless steel installation has been completed on the project, featuring high-quality flanged connections and orbital welding. Electromotorized valves and fittings have been installed for reliable automation and precise flow control. Pipelines are neatly mounted on supporting structures with anti-vibration protection, ensuring long-lasting and safe system operation.